City Engineer Rich Engle said the pavement “is badly rutted due” as a result of heavy truck traffic that goes through this intersection.
“We identified the problem earlier this year and are finally able to schedule the repairs tonight,” he said. “This repair is a ‘Band-aid’ fix at the present time. More permanent repairs will be done in the future.”
Traffic control will be in place during the time of the lane restrictions, and motorists are advised to be cautious and obey all traffic control devices.
About the Author